Exposed Aggregate Cost in Perth: Real Prices Per Square Metre
Exposed aggregate runs $115 to $155 per square metre installed in Perth, and here's exactly what moves a job to the top or the bottom of that band.
Rates on this page are GST inclusive and come from the same config the estimator uses. Last checked .
Exposed aggregate is the most popular driveway upgrade in WA, and it's also the finish people find hardest to get a straight price on. So here's the number first.
Exposed aggregate costs $115 to $155 per square metre, installed, GST included. That's the published Flow Form rate across metro Perth. Where a job lands inside that band comes down to three things: how big it is, what stone goes in it, and what has to happen before anyone can pour.
Everything below shows the working. If you'd rather just have a number for your own driveway, the instant estimator gives you one in about 30 seconds and doesn't ask for your email.
What the rate covers, and what it doesn't
The rate is for a finished slab. It covers minor site prep on a typical Perth sand pad, SL72 steel mesh on chairs through the slab, 100mm of concrete, the pour, the finish and the wash back that reveals the stone, control joints cut within a day or two, sealing and cleanup.
Priced separately, because these swing too far between jobs to bundle in:
- Demolition and bulk earthworks, if an old driveway or paving has to come out
- Thickening to 125mm where cars drive, at $10 to $25 per m2
- Excavation surprises like rock or deep fill, and engineering reports
- Council crossover permits and drainage runs
All of it gets flagged at the site visit, before it lands on a quote.
Size changes the rate more than people expect
A 12 m2 path and a 160 m2 driveway don't cost the same per metre, because a big chunk of any pour is fixed: crew, truck, formwork, setup. Spread across 12 square metres that hurts. Spread across 160, it barely registers.
| Area | Size factor | Effective rate per m2 |
|---|---|---|
| Under 20 m2 | x1.25 | $143.75 to $193.75, with a $2,500 minimum |
| 20 to 29 m2 | x1.15 | $132.25 to $178.25 |
| 30 to 79 m2 | x1.00 | $115 to $155 |
| 80 to 149 m2 | x0.95 | $109.25 to $147.25 |
| 150 m2 and up | x0.90 | $103.50 to $139.50 |
So a 15 m2 front entry prices at $2,500 to $2,950: the small works rate lifts the metre rate, and the minimum catches the bottom. The flip side is that adding the side path while the crew and the truck are already there is the cheapest concrete you'll ever buy.
A worked example: a 66 m2 double driveway
Most double driveways in Perth land between 60 and 80 square metres. Take 66, a 6 metre by 11 metre run from the garage to the kerb. That sits in the standard tier, so the factor is 1.00:
- 66 x $115 = $7,590
- 66 x $155 = $10,230
Rounded the way the estimator rounds, low down and high up to the nearest $50, that's $7,550 to $10,250 on a clean sand pad.
Now the realistic version. Cars park on it, so it wants the thickening, and a cracked slab has to come out first. Each row adds to the one above.
| What you're pouring | Estimate, GST included |
|---|---|
| 66 m2 exposed aggregate, clean pad | $7,550 to $10,250 |
| Plus thickening to 125mm for vehicles | $8,250 to $11,900 |
| Plus demolishing the old driveway | $10,550 to $15,850 |
| Plus a pump for tight rear access | $11,750 to $17,450 |
The per-square-metre extras don't get the size discount. Carting away 66 m2 of old concrete isn't cheaper per metre than carting away 30 m2, so discounting it would be dishonest.
What pushes a job to the top of the band
Premium seeded stone. Standard blends sit inside the published band. Premium and custom seeded stone adds $20 to $40 per m2, so on that 66 m2 driveway it's another $1,320 to $2,640, taking it to roughly $8,900 to $12,900. The blends are on the exposed aggregate page, and it's worth seeing samples in daylight.
Tight access. If a truck can't get a chute to the pour, the concrete goes in by pump, at $1,200 to $1,600 flat. That's most rear courtyards, most side-of-house runs past a meter box, and anything through a gate, and it's a big enough line to be worth checking access before you compare quotes.
Demolition. $35 to $60 per m2. Old crossovers, thick unreinforced slabs and paving over a compacted rubble base sit at the top of that.
Past the priced extras, what adds labour is shape and detail: small panels, feature bands, steps, curves, steep falls. None of that has a tidy per-metre number, which is why the fixed quote comes after someone stands on your block.
Why the cheapest quote is often the one that skips something
There are two easy ways to take real money out of a quote, and both are invisible on handover day.
Thin the slab. Dropping from 100mm to 75mm removes a quarter of the concrete. On a 66 m2 driveway that's 6.6 cubic metres down to about 5. Smaller order, identical-looking driveway, right up until a loaded ute parks on it.
Skip the mesh, or lay it wrong. SL72 mesh held on chairs in the body of the slab is what keeps a shrinkage crack hairline instead of open. Mesh dropped on the sand and poured over does almost nothing, because it ends up under the slab where it can't work. You can't see that from the top. You can see it in year three.
Ask every quote three questions: how thick, what mesh, and where does the mesh sit. A $2,000 gap usually explains itself.
Perth conditions that move the price
Sand pads. Most of the coastal plain is sand, which compacts well and drains, and that's exactly why minor site prep sits inside the rate here. Limestone rubble fill, clay through the hills, or deep fill where a pool used to be is a different conversation, which is what the site visit is for.
The crossover. The section over the verge between your boundary and the road belongs to the council. Permits and council specification sit outside our price, so start that paperwork early. Approval takes longer than the pour.
Summer pour timing. A hot easterly pulls water out of a slab fast, and exposed aggregate has a narrow window between too green to wash back and too hard to reveal. We call the pour on the forecast 48 hours ahead. We don't pour in the rain. A date that moves two days beats a finish that never comes right. The full sequence is on the process page.
From estimate to fixed number
Run your own figures through the estimator: pick exposed aggregate, enter your area, tick demolition or a pump, and you have a range in half a minute with no email gate. A free site visit then gets it measured properly and turns that into a written fixed quote, which is the number that counts. Get in touch to book one.
If exposed lands higher than you want, plain and coloured runs $75 to $110 per m2 and liquid limestone runs $85 to $115. Same prep, same mesh, different surface. Honed concrete goes the other way, at $160 to $210.
Questions we get asked
How much does an exposed aggregate driveway cost in Perth?
Most double driveways are 60 to 80 square metres. At 66 m2 the estimate is $7,550 to $10,250 including GST, before vehicle thickening or removing an old slab. A single driveway of around 35 m2 comes in at $4,000 to $5,450.
Is exposed aggregate more expensive than plain concrete?
Yes, by about $40 per square metre. Plain and coloured is $75 to $110 per m2 against $115 to $155 for exposed. On that same 66 m2 driveway, plain works out at $4,950 to $7,300 against $7,550 to $10,250.
Why do exposed aggregate quotes vary so much in Perth?
Usually because they aren't quoting the same slab. Thickness, mesh and mesh placement are the big three, and demolition, vehicle thickening and pump access are often left off a cheap quote and added later. Get every quote to state thickness, mesh type and exclusions, then compare.
Does the price include removing my old driveway?
No, demolition is priced separately at $35 to $60 per m2, and it doesn't attract the size discount. On a 66 m2 driveway that's $2,310 to $3,960 on top of the pour. Tick it in the estimator to see it inside your own range.
More cost guides
- How Much Does a Concrete Driveway Cost in Perth? Price Guide A concrete driveway in Perth costs $75 to $210 per square metre installed, GST included, which puts a typical double between $5,250 and $14,700.
- Liquid Limestone vs Honed Concrete for Perth Pool Surrounds Liquid limestone runs $85 to $115 per m2 and honed concrete $160 to $210, so the choice around a Perth pool comes down to heat, grip, upkeep and budget.
- Why concreters charge a minimum for small jobs in Perth A 6 m2 bin pad and a 15 m2 path both land on the same $2,500 minimum, and here's the honest reason why, plus three ways to get better value from a small pour.